Energy

Power line and renewable asset inspection

The same operator network used on telecom towers covers power transmission and renewable assets. One method, one Operations desk, one quality standard.

Assets

Scope is agreed before flight. A second structure is a second unit. We do not assume one flight covers more than one asset.

Questions asset managers ask

Can the telecom network fly energy assets?

Yes, where the operator holds the rating and the aircraft matches the method. Assignment stays regional.

Is thermography included by default?

No. It is a separate requirement and a separate rate.

Request a unit rate